|
Some of the most important machines, equipment,
spares produced by the Pintér Works, and references:
|
|
| Partners
|
|
| Partner |
Referencia |
|
|
|
| ALSTOM |
• Condenser
water chambers Delas style for 3 blocks 4x4=16 pc production • Distance support structure manufacturing for drill (34+2 pc) • 16 pc water chamber manufacturing. Facility: Paks Nuclear Power Plant • 8 pc water chamber manufacturing. Facility: Paks Nuclear Power Plant • 8 pc + 8 pc cable interconnection wall drilling • Block 3 and Block 4 condenser monitoring door production • DELAS Condenser (610 X; 611 X) manufacturing • III. Block 5 and 6 water chamber modification • PA Plc. Condenser water chamber manufacturing with ALSTOM, 1., 2. Blokk (total 16 pc) • PA Plc. Condenser water chamber manufacturing with ALSTOM, 2. Block (8+8 pc) • Mexican condenser manufacturing 260MW TAUMIN • Assignments in Egypt • TAMUIN groove sector assigment • YANBU "dog bone" assignment • MANJUNG groove sector • 22 pc distance support manufacturing • 220 pc 24 mm hole cable interconnect drilling • KEADBY spare parts manufacturing |
| CSEPELI CSŐGYÁR | • Spare
and replacement parts manufacturing |
| CSŐSZER PAKS KFT. | • Earthquake protection strengthening
work ABOS 2 |
| DUNAI Repülőgépgyár Rt. | • Mechanical testing tables |
| Dunaújvárosi Papírgyár | • Paper
Plant of Dunaújváros 500 type steam pipeline steel structure
pipe support |
| EGI RT. | • Flange manufacturing |
| GAMMA MANAGER Kft. | • C 4/4 - 720 type electric machine
manufacturing |
| GANZ Híd, Daru és Acélsz.RT. | • Milling assigment work |
| KIARMO STULZ |
• Twin type and protection tank
manufacturing • Seed receptacle manufacturing (Switzerland) |
| Központi Fizikai Kutató Intézet Bp. | • Space
electronic tap, personal dose meter for NASA astronauts |
| LUBING | • LUBING
gear - hand lift pulley manufacturing |
| MIRROTRON Ltd. |
• MIRROTRON
mirror system (neutron guide channels) manufacturing • Clamping equipment manufacturing for neutron guide mirrors • Argentina Test Reactor: Replaceable vacuum house manufacturing • Argentina Test Reactor : tap manufacturing • Argentina Test Reactor: kartridge manufacturing • Argentina Test Reactor: LANL In-pile FP13 production • Vacuum table (3 types) manufacturing • For nuclear area: FP12 NEUTRON GUIDE manufacturing • For nuclear area: Sealing Spherical Front Plate manufacturing • For nuclear area: MIRROTRON Equipment prototype production • Neutron guide channel: MR02-14-1420 (2000x199x161) manufacturing • Neutron guide channel: MR01-05-001-1 (2000x167x158) manufacturing • Neutron guide channel: MR01-05-001-2 manufacturing • Crossflow water heater manufacturing |
| NOKIA Hungaria Kft. | • NOKIA grilled tower production |
| PAKSI ATOMERŐMŰ RT. |
• Burned
Cartridge Temporary Storage, Cycle 1, Phase 1 mechanical work
50% • Burned building structure manufacturing • Burned Cartridge Temporary Storage top lifting equipment manufacturing • Burned Cartridge Temporary Storage assistance equipment: Container lift lock manufacturing • Burned Cartridge Temporary Storage assistance equipment: Container lift lock support manufacturing • Burned Cartridge Temporary Storage assistance equipment: Transfer machine for video camera shading tap identification • Reactor support equipment: KNI detector winding object machine manufacturing (research & development) • Scissors lifting table manufacturing 1500kg/3m 8 pc • Blocks 1-4 rest basin balance production (support equipment) • Steam overheater separator reconditioning and replacement • Turbine flow transfer cable modification and piping separator fixtures • Full power condensing cleaner acid system reconstruction • Generator hydrogen and oil emergency withdrawal system fixing • Cooling machine housing reconstruction, cooling compressor replacement • Hermetic wall transfer replacement • Safety cooling water system rebuilding • Manual switch-off equipment production 10T • Reactor support equipment: Examination and rescue bridge II production • Burned Cartridge Temporary Storage, cycle I, Phase 1, installation, C-30 container drill hole expansion • Solid waste container restructuring - service mechanic equipment manufacturing • Burned Cartridge Temporary Storage, cycle I, Phase 2; Fuel container piping, shading taps, inserts and support sheets, corrosion sample equipment manufacturing and installation • Burned Cartridge Temporary Storage, cycle I, Phase 2 - Loading deck steel structure, walkways and support columns, construction interconnection structure manufacturing and installation • Primary current cycle support equipment: SMR housing 4 pc manufacturing • Primary current cycle support equipment: Protection housing production 18 pc • Interconnection item manufacturing • Reactor dome test sideseam examination support equipment production • Primary cycle overpressure test equipment manufacturing 3+3 pc • Primary cycle overpressure test equipment manufacturing 3+3 pc • Primary cycle safety equipment: bubble extinguishing tank manufacturing and installation (fission disk) • Primary cycle safety increase equipment: gas extraction choking element production • Liquid radioactive waste water management • Reactor equipment. Internal rod swith equipment • Reactor tank bottom ultrasound examination ready manipulator • Reactor tank bottom 3/5" seam ultrasound examination • Reactor safety increase equipment: Foreign material extraction and filter • Reactor building 250/32/2 Mp crane restructuring, safety level increase design • Block 2 water chamber painting job • AKO 10 and 11 package - nuclear power plant maintenance work • Filter for primary cycle equipment: UWF120-3-100 Balduf filter • Maintenance Practice Centre water supply distribution pipeline exchange (steam generator) • Maintenance parts manufacturing • Main Service Department Blocks 1-4 preheating section earthquake resistance work • Primary cycle high pressure preheating membrane manufacturing |
| PANNON GSM |
• 30 m,40 m,50 m,60 m,70 m high
PANNON antenna tower • 50 m high PANNON GSM tower • 40 m high PANNON GSM tower |
| Radioaktív Hulladékokat Kezelő Kht. |
• B-type container capable of readioactive
waster transport • Burned Cartridge Temporary Storage, cycle I, Phase 3, undertaking as a General Contractor |
| ÚJPESTI ERŐMŰ |
• Ion replacement equipment restructuring
6 pc, anion replacement tank 2 pc • Mixed bed ion replacement equipment 3 pc |
| VEGYÉPSZER RT. |
• Burned
Cartridge Temporary Storage cycle I, Phase 3, Steel Building
Structure manufacturing • Stainless steel adornment manufacturing |
|
WESTEL |
• 40,
50 m high WESTEL 900 tower manufacturing |