Some of the most important machines, equipment, spares produced by the Pintér Works, and references:

CIS countries

  •  PUR foaming stocks (yokes) and devices, equipment, for 16 different companies manufacturing refrigerators.
  •  Heat insulated accommodation trailer sites for Siberian oil miners.


Germany

  •  manufacturing of environmental briquetting equipment
  •  portable current generators driven by gasoline and diesel engines for the German army
  •  floor drain made of high-alloyed cast acid-proof chromium steel, in glossy polished version
  •  machined parts from paper processing lines


France

  •  buckets, skip tilting mechanisms for trucks
  •  high-pressure pipe closing organs
  •  manual worm-gears
  •  heat exhangers


Mexico

  •  manufacturing of 260 MW heat exchangers


Hungary

  •  for the petroleum industry company, manufacturing of polished drilling sampler device, made of cast steel
  •  pipe factory reconstruction for manufacturing of seamless tubes
  •  GSM towers from 30 m to 90 m
  •  GSM special rooftop poles
  •  travel cranes with 30 tonnes capacity
  •  pump components made of acid-proof steel casting
  •  manufacturing of containers
  •  steel structures
  •  industrial pipeline systems
  •  hydraulic lifting table


Products for nuclear power plants:

  •  nuclear waste container grasping device
  •  sampler sections
  •  reactor monitoring probes
  •  reactor zone thermometers
  •  manufacturing of temporary containers for burnt out nuclear heating elements
  •  manufacturing of turbine steam condenser headers and other equipment for nuclear power stations
  •  detector lifting single-purpose machine
  •  heat exchangers for nuclear power stations
  •  inspection and rescue bridge II.
  • Purpose: inspection and documentation of the internal surface of the reactor container.
  • Inspection of the internal surface of the retention and revision basins.
  • Removal of the objects fallen into the reactor container, retention and revision basins.
  •  Setting of ‘Balduf’ filters in the retention basins
  • Purpose: Continuous filtration of the nuclear contamination in the boric acid water
  •  planning and manufacturing of barrels storing and transporting radiating matter with biological protection
  • Purpose: transportation and burying of low and high activity radiating matter
  •  examination of external surfaces and welded joints of reactor container
  • Purpose: design and manufacturing of boosters to make ultrasonic examinations in remote controlled and automatic version



 equipment to connect and disconnect intermediate rod
Purpose: to connect and disconnect adjusting rods to or from the fuel cassettes remote controlled and automatically


The Pintér Works undertake the implementation and assembling of power stations, nuclear power station respectively industrial establishments.

Our quality assurance system and our references so far will guarantee the professional effectuation.

Partners
Partner

Referencia


ALSTOM
• Condenser water chambers Delas style for 3 blocks 4x4=16 pc production
• Distance support structure manufacturing for drill (34+2 pc)
• 16 pc water chamber manufacturing. Facility: Paks Nuclear Power Plant
• 8 pc water chamber manufacturing. Facility: Paks Nuclear Power Plant
• 8 pc + 8 pc cable interconnection wall drilling
• Block 3 and Block 4 condenser monitoring door production
• DELAS Condenser (610 X; 611 X) manufacturing
• III. Block 5 and 6 water chamber modification
• PA Plc. Condenser water chamber manufacturing with ALSTOM, 1., 2. Blokk (total 16 pc)
• PA Plc. Condenser water chamber manufacturing with ALSTOM, 2. Block (8+8 pc)
• Mexican condenser manufacturing 260MW TAUMIN
• Assignments in Egypt
• TAMUIN groove sector assigment
• YANBU "dog bone" assignment
• MANJUNG groove sector
• 22 pc distance support manufacturing
• 220 pc 24 mm hole cable interconnect drilling
• KEADBY spare parts manufacturing
CSEPELI CSŐGYÁR • Spare and replacement parts manufacturing
CSŐSZER PAKS KFT. • Earthquake protection strengthening work ABOS 2
DUNAI Repülőgépgyár Rt. • Mechanical testing tables
Dunaújvárosi Papírgyár • Paper Plant of Dunaújváros 500 type steam pipeline steel structure pipe support
EGI RT. • Flange manufacturing
GAMMA MANAGER Kft. • C 4/4 - 720 type electric machine manufacturing
GANZ Híd, Daru és Acélsz.RT. • Milling assigment work
KIARMO STULZ
• Twin type and protection tank manufacturing
• Seed receptacle manufacturing (Switzerland)
Központi Fizikai Kutató Intézet Bp. • Space electronic tap, personal dose meter for NASA astronauts
LUBING • LUBING gear - hand lift pulley manufacturing
MIRROTRON Ltd.
• MIRROTRON mirror system (neutron guide channels) manufacturing
• Clamping equipment manufacturing for neutron guide mirrors
• Argentina Test Reactor: Replaceable vacuum house manufacturing
• Argentina Test Reactor : tap manufacturing
• Argentina Test Reactor: kartridge manufacturing
• Argentina Test Reactor: LANL In-pile FP13 production
• Vacuum table (3 types) manufacturing
• For nuclear area: FP12 NEUTRON GUIDE manufacturing
• For nuclear area: Sealing Spherical Front Plate manufacturing
• For nuclear area: MIRROTRON Equipment prototype production
• Neutron guide channel: MR02-14-1420 (2000x199x161) manufacturing
• Neutron guide channel: MR01-05-001-1 (2000x167x158) manufacturing
• Neutron guide channel: MR01-05-001-2 manufacturing
• Crossflow water heater manufacturing
NOKIA Hungaria Kft. • NOKIA grilled tower production
PAKSI ATOMERŐMŰ RT.
• Burned Cartridge Temporary Storage, Cycle 1, Phase 1 mechanical work 50%
• Burned building structure manufacturing
• Burned Cartridge Temporary Storage top lifting equipment manufacturing
• Burned Cartridge Temporary Storage assistance equipment: Container lift lock manufacturing
• Burned Cartridge Temporary Storage assistance equipment: Container lift lock support manufacturing
• Burned Cartridge Temporary Storage assistance equipment: Transfer machine for video camera shading tap identification
• Reactor support equipment: KNI detector winding object machine manufacturing (research & development)
• Scissors lifting table manufacturing 1500kg/3m 8 pc
• Blocks 1-4 rest basin balance production (support equipment)
• Steam overheater separator reconditioning and replacement
• Turbine flow transfer cable modification and piping separator fixtures
• Full power condensing cleaner acid system reconstruction
• Generator hydrogen and oil emergency withdrawal system fixing
• Cooling machine housing reconstruction, cooling compressor replacement
• Hermetic wall transfer replacement
• Safety cooling water system rebuilding
• Manual switch-off equipment production 10T
• Reactor support equipment: Examination and rescue bridge II production
• Burned Cartridge Temporary Storage, cycle I, Phase 1, installation, C-30 container drill hole expansion
• Solid waste container restructuring - service mechanic equipment manufacturing
• Burned Cartridge Temporary Storage, cycle I, Phase 2; Fuel container piping, shading taps, inserts and support sheets, corrosion sample equipment manufacturing and installation
• Burned Cartridge Temporary Storage, cycle I, Phase 2 - Loading deck steel structure, walkways and support columns, construction interconnection structure manufacturing and installation
• Primary current cycle support equipment: SMR housing 4 pc manufacturing
• Primary current cycle support equipment: Protection housing production 18 pc
• Interconnection item manufacturing
• Reactor dome test sideseam examination support equipment production
• Primary cycle overpressure test equipment manufacturing 3+3 pc
• Primary cycle overpressure test equipment manufacturing 3+3 pc
• Primary cycle safety equipment: bubble extinguishing tank manufacturing and installation (fission disk)
• Primary cycle safety increase equipment: gas extraction choking element production
• Liquid radioactive waste water management
• Reactor equipment. Internal rod swith equipment
• Reactor tank bottom ultrasound examination ready manipulator
• Reactor tank bottom 3/5" seam ultrasound examination
• Reactor safety increase equipment: Foreign material extraction and filter
• Reactor building 250/32/2 Mp crane restructuring, safety level increase design
• Block 2 water chamber painting job
• AKO 10 and 11 package - nuclear power plant maintenance work
• Filter for primary cycle equipment: UWF120-3-100 Balduf filter
• Maintenance Practice Centre water supply distribution pipeline exchange (steam generator)
• Maintenance parts manufacturing
• Main Service Department Blocks 1-4 preheating section earthquake resistance work
• Primary cycle high pressure preheating membrane manufacturing

PANNON GSM
• 30 m,40 m,50 m,60 m,70 m high PANNON antenna tower
• 50 m high PANNON GSM tower
• 40 m high PANNON GSM tower
Radioaktív Hulladékokat Kezelő Kht.
• B-type container capable of readioactive waster transport
• Burned Cartridge Temporary Storage, cycle I, Phase 3, undertaking as a General Contractor
ÚJPESTI ERŐMŰ
• Ion replacement equipment restructuring 6 pc, anion replacement tank 2 pc
• Mixed bed ion replacement equipment 3 pc
VEGYÉPSZER RT.
• Burned Cartridge Temporary Storage cycle I, Phase 3, Steel Building Structure manufacturing
• Stainless steel adornment manufacturing

WESTEL

• 40, 50 m high WESTEL 900 tower manufacturing